Commercial construction estimating

Offices, retail, restaurants, healthcare and multifamily, priced trade by trade from your plans, with alternates and a total ready for the bid form.

We price commercial projects the way a commercial bid is built: every CSI division from your drawings, general conditions from the schedule, alternates and unit prices on their own lines, and a total that drops into the bid form. Each trade is broken out, so you can check sub quotes against it, and labor is priced at local or prevailing wage rates.

What’s included

  • Every CSI division, from site work to finishes and MEP
  • General conditions priced from the schedule
  • Alternates, unit prices and allowances on their own lines
  • Prevailing wage on public work
  • A scope clarifications and exclusions list
  • Cost per square foot and a total ready for the bid form

Commercial projects we estimate

Project typeWhat usually drives the price
Office and retail fit-outsPartitions, ceilings, finishes, lighting and power, and phasing in occupied buildings
RestaurantsKitchen equipment connections, grease waste, exhaust hoods and finishes
HealthcareMEP density, medical gas, and infection-control requirements during renovation
MultifamilyRepetition by unit type, corridors and amenity spaces, and MEP risers
Industrial and warehousesSlabs, structural steel, roofing, site work and utilities
Schools and public buildingsPrevailing wage, bonds, and phasing around the people using the building

How a commercial estimate is organized

The estimate follows CSI MasterFormat, so it lines up with the specs, the bid form and the way subs quote. Each division is priced from the drawings: quantities measured, then material, labor hours and equipment. General conditions are priced from the schedule, not as a percentage: supervision for the months the job runs, temporary facilities, cleanup, permits and insurance.

Alternates, unit prices and allowances sit on their own lines with any general conditions they add, so the numbers you write on the bid form are complete. A clarifications and exclusions list says what the price includes, so nobody assumes otherwise.

Public work and prevailing wage

Public projects bring their own rules. Federally funded construction contracts over $2,000 fall under the Davis-Bacon Act, and most states have prevailing wage laws for state and local work; we price labor at the wage determination the bid names. Public bids also ask for bonds and an exact bid form; our guides on how to bid a construction job and bid bonds walk through both.

What you receive

  • A live estimate in 3D and on your plans, trade by trade. Change any quantity, rate or markup and the total follows.
  • An Excel workbook by CSI division with formulas left open, and a summary laid out like your bid form. Send us one of your past bids and we build it in your format.
  • Marked-up plans, the exclusions list, and a proposal with your logo.
  • A read-only link for the owner or GC, showing only the prices you choose.

For the whole building as a GC, see general contractor estimating. To see what estimating services cost and include elsewhere, read construction estimating services: what they cost.

Questions contractors ask

Do you estimate every trade on a commercial project?

Yes, every CSI division on the drawings, or only the trades you ask for. Tell us your scope and what you self-perform.

Do you price prevailing wage work?

Yes. We price labor at the wage determination the bid documents name, and say in the estimate which one we used.

Can you price alternates and unit prices?

Yes. Each alternate and unit price is its own line, with the general conditions it adds, so your bid form adds up.

How much does a commercial estimate cost?

Commercial estimates start at $399. A full building is quoted on its size and the number of trades, and you see the fixed price before we start.

Bid due this week?
Send it over.