Plumbing estimating services
Every fixture, pipe run and piece of equipment on your plans, counted, measured and priced as your own crew’s work.
We take off the plumbing from your drawings: fixtures from the fixture schedule, waste and vent, water and gas piping by size and material, and the equipment that goes with them. Each line carries material and labor hours at the wage for the area, so the price is your crew’s work, not a guess per fixture.
What’s included
- Fixtures and equipment from the fixture schedule
- Waste, vent and storm piping by size and material
- Water piping: PEX, copper or CPVC, by size
- Gas piping and connections when they are in scope
- Underground and above-ground work on their own lines
- Labor hours at local or prevailing wage rates
What we take off
| Item | How we count it |
|---|---|
| Fixtures | Each, by type and mark from the fixture schedule: water closets, lavatories, sinks, showers, floor drains |
| Equipment | Water heaters, pumps, backflow preventers, interceptors and expansion tanks |
| Waste and vent | Linear feet by size and material, such as PVC, ABS or cast iron, with fittings and cleanouts |
| Water | Linear feet by size and material, such as PEX, copper or CPVC, with valves and insulation where specified |
| Storm | Roof drains, overflow drains and leaders, by size |
| Gas | Pipe by size from the meter to each appliance, with valves and connectors |
| Underground | Trenching, bedding and backfill for pipe below the slab or out to the property line |
Reading the plumbing set
The riser diagrams and isometrics give pipe sizes and drops. The fixture schedule gives the counts and models. The specs give the materials, the testing and the insulation. The architectural plans and interior elevations show fixtures that the plumbing sheets sometimes miss, so we read them too.
Pipe sizes come from fixture units in the plumbing code your state has adopted, the International Plumbing Code or the Uniform Plumbing Code. When a set does not size the pipe, we size it from the fixture units and list the sizes as assumptions you can confirm.
How the price is built
Fixtures are counted each and pipe is measured by the foot, by size and material, with fittings. Labor is priced in hours per unit, split into underground, rough-in and finish, because each is its own trip to the job. Then come testing, sleeves, firestopping, insulation, permits and fees, and your overhead and profit. On public work we use the prevailing wage for the county and trade.
What you receive
- A live estimate in 3D and on your plans, with every run routed and measured.
- An Excel workbook with fixtures, pipe by size and material, fittings and labor hours, formulas left open. Send us one of your past bids and we build it in your format.
- Marked-up plans, a bid summary, and a proposal with your logo.
What gets missed most
- Fixtures shown only on architectural plans or interior elevations.
- Hose bibbs, trap primers and floor sinks.
- Vent runs through the roof and their flashings.
- Sleeves, firestopping and pipe insulation from the specs.
- Testing, disinfection and inspections.
- Utility connections, and the trench out to the property line.
Questions contractors ask
Do you price plumbing per fixture or per foot of pipe?
Both. Fixtures are counted each and pipe is measured by the foot, by size and material, with labor hours on every line. A price per fixture alone hides the pipe.
Do you do commercial plumbing estimating?
Yes: offices, retail, restaurants, healthcare and multifamily, as well as homes and remodels.
Do you include gas piping and storm drains?
When they are in your scope. Tell us what your package includes and we price those systems on their own lines.
What do I need to send?
The plumbing plans, riser diagrams, fixture schedule and Division 22 specs, plus the architectural plans so we can check fixture locations.
Other trades we price
Electrical estimating
Devices, fixtures, wire, conduit, gear and labor hours.
Drywall estimating
Board, framing, ceilings, finish levels and labor.
Painting estimating
Walls, ceilings, doors, frames, trim and exteriors.
Roofing estimating
Squares by slope, underlayment, flashing and tear-off.
Stucco estimating
Wall area, lath, trims, joints and scaffolding.
General contractor estimating
Every CSI division, general conditions and alternates.
Lumber & framing estimating
Studs, plates, headers, joists, sheathing and hardware.
Mechanical & HVAC estimating
Equipment, ductwork, air devices, piping and controls.