Skip to content
bidme

Painting estimating services

Every painted surface on the plans, by system and coat, with paint, labor and access priced in.

We take off every surface your crew will paint, room by room, and price it with the coats and products the specs call for. Walls, ceilings, doors, frames, trim and exteriors each get their own line, with the labor hours and the gallons behind them.

What’s included

  • Walls and ceilings by room, surface and paint system
  • Doors and frames counted each, trim and railings by length
  • Exterior walls, soffits and fascia by elevation
  • Coats, primers and products from the paint schedule
  • Labor at local or prevailing wage rates
  • Lifts and scaffolds where heights need them

What we take off

We start with the finish schedule and the paint specs, then measure each room against them. A wall that gets a primer and two coats of eggshell is a different line from a ceiling with one coat of flat, even in the same room.

SurfaceHow we measure it
WallsSquare feet by room and paint system, net of large openings
CeilingsSquare feet by room, with high ceilings flagged for lifts
DoorsCounted each, by type: flush, panel, hollow metal, and both faces
FramesCounted each, hollow metal frames on their own line
Trim, base and railingsLinear feet by type
ExteriorSquare feet by elevation and substrate: siding, stucco, block, metal
Special coatingsEpoxy floors, high-performance coatings, and exposed steel and ductwork, when in scope

How the price is built

Paint is priced from the square feet and the spread rate of each product, coat by coat. Labor follows production rates for each surface, because cutting in trim takes longer per foot than rolling an open wall. Then come primer and prep, masking, lifts, sales tax on material and your markups.

Public jobs often require prevailing wage. When they do, we use the wage determination for the county and trade, and say which one in the estimate.

Exteriors and repaints

Exteriors are measured elevation by elevation, with the substrate on each line, because rough stucco and block take more paint than smooth siding. On repaints we price the prep the job needs: washing, scraping, patching and spot priming, listed so the owner can see it.

What you receive

  • A live estimate in 3D and on your plans, with each surface type in its own color.
  • An Excel workbook with every room, surface, coat, gallon and labor hour, formulas left open. Send us one of your past bids and we build it in your format.
  • Marked-up plans, a bid summary, and a proposal with your logo.

For a quick check on a few rooms, try our free paint calculator. Our guide on how to estimate a commercial painting job walks through the method step by step.

What gets missed most

  • Door and frame counts on a large school or office.
  • Accent walls and different colors that each need their own cut-in.
  • Exposed ceilings, ductwork and steel in open areas.
  • Prep on repaints, and the primer under a dark-to-light color change.
  • Access: lifts in tall lobbies and gyms, scaffolds on exteriors.

Questions contractors ask

How do you work out the gallons?

From the square feet of each surface, the number of coats, and the spread rate on the product data sheet, with a waste factor. The gallons for each product are shown in the workbook.

Do you price prevailing wage jobs?

Yes. For public work we use the wage determination for the county and trade, and the estimate says which one we used.

Can you price exteriors and repaints?

Yes. Exteriors are measured by elevation and substrate. On repaints we list the prep, such as washing, scraping, patching and spot priming, so it is visible in the bid.

What do I need to send?

The plans with the finish schedule and room finish legend, the paint specs (Division 09 91 00) and any addenda. For repaints, photos help.

Bid due this week?
Send it over.