Estimating for general contractors
The whole building, division by division, with general conditions and a total you can put on the bid form.
We price the whole job the way a GC bids it: every CSI division from site work to finishes, the general conditions that carry the project, and the alternates the bid form asks for. Each trade is broken out, so you can compare it with the sub quotes you get and use the stronger number.
What’s included
- Every CSI division, line by line from your drawings
- General conditions: supervision, temporary facilities, cleanup
- Trade breakdowns to check sub quotes against
- Alternates and value-engineering options priced on their own
- Scope clarifications and exclusions list
- Cost per square foot and a bid-form ready total
How a GC estimate is organized
We follow CSI MasterFormat, so the estimate drops straight into a bid form and lines up with how subs quote. Each division is priced from the drawings, not from a cost per square foot.
| Division | What we price |
|---|---|
| 01 General requirements | Supervision, temporary facilities, cleanup, permits and fees you carry |
| 02 to 05 | Demolition, concrete, masonry and metals |
| 06 to 09 | Wood, roofing and waterproofing, doors and windows, finishes |
| 10 to 14 | Specialties, equipment, furnishings, conveying |
| 21 to 28 | Fire suppression, plumbing, HVAC and electrical |
| 31 to 33 | Earthwork, exterior improvements and utilities |
Sub quotes and self-perform work
Every trade comes with its own quantities and a price built from material and labor. When your sub quotes arrive, you can compare each one with our number on the same scope, and spot the quote that left something out. For the work you do with your own crews, the labor hours are on every line.
General conditions
General conditions are where a GC's margin hides. We price them from the schedule: the superintendent and project manager for the months the job runs, the trailer, toilets, fencing, dumpsters, temporary power and water, final cleaning, and the insurance and bonds you carry.
What you receive
- A live estimate in 3D and on your plans, trade by trade. Change any quantity, rate or markup and the total follows.
- An Excel workbook by division with formulas left open, plus a summary in your bid-form layout. Send us one of your past bids and we build it in your format.
- Marked-up plans, a scope and exclusions list, and a proposal with your logo.
- A read-only link for the owner or architect, showing the prices you choose.
What gets missed most
- General conditions carried as a percentage instead of priced from the schedule.
- Scope that falls between two trades, such as blocking, firestopping and access panels.
- Alternates priced without the general conditions they add.
- Site utilities beyond the property line.
- Escalation on long jobs and materials with long lead times.
Bidding the job yourself? Our guide on how to bid a construction job covers the bid documents, bonds and the bid form, and the free construction estimate template gives you the spreadsheet.
Questions contractors ask
Do you price every trade or only some?
Every division on the drawings, or only the ones you ask for. Tell us your scope and the trades you self-perform, and we price it that way.
Can I compare your numbers with my sub quotes?
Yes. Each trade has its own quantities and price, so you can set a sub quote next to our number for the same scope and see what is missing.
Do you price alternates?
Yes. Each alternate is priced on its own line with the general conditions it adds, so the add or deduct on your bid form is complete.
How much does a GC estimate cost?
Commercial estimates start at $399 and residential at $199. A full building with every division is quoted on its size and the number of trades, and you see the fixed price before we start.
Other trades we price
Electrical estimating
Devices, fixtures, wire, conduit, gear and labor hours.
Drywall estimating
Board, framing, ceilings, finish levels and labor.
Painting estimating
Walls, ceilings, doors, frames, trim and exteriors.
Roofing estimating
Squares by slope, underlayment, flashing and tear-off.
Stucco estimating
Wall area, lath, trims, joints and scaffolding.
Lumber & framing estimating
Studs, plates, headers, joists, sheathing and hardware.
Plumbing estimating
Fixtures, pipe, fittings, equipment, gas and labor.
Mechanical & HVAC estimating
Equipment, ductwork, air devices, piping and controls.


