Skip to content
bidme

Stucco estimating and takeoffs

Every elevation measured, with the lath, trims, joints and scaffolding a stucco bid lives on.

We measure every stucco surface elevation by elevation, including gables, soffits and returns, and take off the accessories that make or break a stucco bid: weep screed, casing bead, corners, and control and expansion joints. You get the system priced coat by coat, with the labor and scaffolding behind it.

What’s included

  • Wall area by elevation, gables and returns included
  • Soffits, columns and foam shapes on their own lines
  • Lath and weather barrier layers from the details
  • Weep screed, casing bead, corners and joints by length
  • Coats from the system: three-coat, one-coat or finish only
  • Scaffolding and labor at local rates

What we measure

We read each elevation against the floor plans and sections, because an elevation alone hides returns, bump-outs and walls that step back. Large openings are deducted; the trims around them are added back as linear feet.

ItemHow we measure it
WallsSquare feet by elevation and system, net of large openings
Gables and returnsMeasured on their own, since they are easy to drop from an elevation count
Soffits and ceilingsSquare feet, priced higher because the work is overhead
Lath and barrierSquare feet, with the layers the details call for
Weep screedLinear feet along the base of every stucco wall, set at least 4 inches above earth or 2 inches above paving as the residential code requires
Casing bead and cornersLinear feet around openings and at outside corners
Control and expansion jointsLinear feet, laid out so no panel is larger than ASTM C1063 allows: 144 square feet on walls, 100 on ceilings and soffits, 18 feet on a side
Columns and shapesCounted each or by length: foam bands, sills, cornices

Systems

A traditional system is three coats over lath: scratch, brown and finish, about 7/8 inch in all over metal lath. One-coat systems replace the first two with a single base coat, usually 3/8 to 1/2 inch. Many jobs also need a finish coat over an existing wall, or patching after other trades. We price the system your specs name, coat by coat, so you can swap one for another and see the difference.

How the price is built

Material comes from the square feet of each coat and the linear feet of each accessory, with waste. Labor follows the system and the wall: tall walls, gables and soffits take longer than an open first-floor wall. Scaffolding is priced by the elevation and how long it stays up. Then come sales tax, equipment and your markups.

What you receive

  • A live estimate in 3D, every stucco face drawn on the building.
  • An Excel workbook with every elevation, accessory and coat, formulas left open. Send us one of your past bids and we build it in your format.
  • Marked-up elevations, a bid summary, and a proposal with your logo.

What gets missed most

  • Gable ends above the plate line and the faces of chimneys and bump-outs.
  • Soffits and the undersides of overhangs and balconies.
  • Control joints the specs require on large wall panels.
  • Trims at every opening, counted as each instead of measured.
  • Scaffolding time on two-story and hillside work.

Questions contractors ask

How do you measure stucco?

In square feet, elevation by elevation, with gables, returns and soffits measured on their own and large openings deducted. Accessories such as weep screed, casing bead, corners and joints are measured in linear feet.

Do you price one-coat and three-coat systems?

Yes. We price the system your specs name, coat by coat, and can show an alternate system on its own line.

Is scaffolding included?

Yes. Scaffolding is priced by elevation and by how long it stays up, as its own line you can adjust.

What do I need to send?

Floor plans, all elevations, sections and wall details, and the exterior finish specs. Details that show the lath and weather barrier help most.

Bid due this week?
Send it over.